Sources & methods

Follow the evidence.
See the boundaries.

Our public explainers draw on government reports, public agencies, and published research. Open the original sources to examine their methods and assumptions.

Executive Order 22 reviewed September 21, 2026. Historical data sources reviewed September 9, 2026. Source dates and data years differ.

01

Governor of Virginia · Executive Order 22 ↗

Signed September 18, 2026; reviewed September 21, 2026

Official order. Section I.B.1 covers the community toolkit and nonprofit engagement; I.B.3 covers VA-LEAD; I.C covers environmental and siting work. Agency workplans, recommendations, and designation criteria are not all final regulations. This source does not establish a partnership with the Initiative.

02

JLARC · Data Centers in Virginia ↗

December 9, 2024

State legislative research commission. Statewide sites and buildings: printed p. 5. Economic impact: pp. 14–15. Water use: pp. 61–63. Historical baseline, not a live inventory.

03

EIA · Virginia electricity growth ↗

May 5, 2026

Federal electricity statistics. Commercial sales: 2019–2025, with 2025 preliminary. Peak demand: the PJM Dominion transmission zone, not a data-center-only or statewide series.

04

Loudoun County · Data centers by the numbers ↗

County inventory dated March 1, 2026; fiscal figures FY2026–FY2027

County government inventory includes buildings that are built or in construction. FY2027 revenue is a budget projection. These county figures cannot be substituted for statewide totals.

Our evidence standards

Useful facts need clear labels.

  1. Date the measure. A source’s publication date is not necessarily the year its data describe.
  2. Name the boundary. Virginia, Northern Virginia, Loudoun County, and the PJM Dominion zone are not interchangeable geographies.
  3. Show the status. Estimates, observed outcomes, preliminary data, and projections are labeled. A project in a pipeline is not assumed to be operating.
  4. Keep the units. Sites, buildings, floor area, demand, energy, and jobs measure different things.
  5. Keep proposals identifiable. The initiative’s policy preferences and discussion draft are not represented as findings endorsed by our sources.

How the graphics are calculated

Peak-load bars start at zero and share a 30,000 MW maximum. Job segments are proportional to 59,000 and 15,000. The national forecast uses a zero-to-900 TWh axis with a 521–843 TWh range and 649 TWh reference marker. The example calculator multiplies average MW by 24 or 8,760 hours; annual GWh divides MWh by 1,000.

Graphics use the published numbers and do not imply additional measurement precision. The approximate statewide count is retained as a 2024 baseline; the newer Loudoun inventory has a different geography and includes construction.

Corrections welcome

Found a newer source or a problem with a definition? Send the original reference and the specific claim to the initiative for review.

Current policy status

Our September 21, 2026 update places the earlier citizen proposal under review following Executive Order 22. Read the update and its source notes. Agency deadlines are distinguished from completed rules or delivered outcomes.

Editorial independence

This is an independent citizen-led initiative. Links to public agencies and research institutions identify sources; they do not imply endorsement. No nonprofit tax status or introduced legislative sponsorship is claimed.